Factory Cheap Hot ASTM F436 F436M Hardened Steel Washers to Singapore Importers

Factory Cheap Hot ASTM F436 F436M Hardened Steel Washers to Singapore Importers

Short Description:

ASTM F436 F436M Hardened Steel Washers Hardened Circular, Clipped Circular, and Extra-Thick Washers, Beveled Washers Metric Size: M12-M100  Inch Size: 1/4”-4” Material Grade: Through hardened washers shall have a hardness of 38 to 45 HRC, except when zinc-coated by the hot-dip process, in which case they shall have a hardness of 26 to 45 HRC. Metric washers are suitable for use with fasteners covered in Specifications A 325M, A 490M, A 563M and with fasteners of Specification F 568 property c...


Product Detail

Product Tags

Control the quality by the details, show the strength by quality. Our company has strived to establish a highly efficient and stable staff team and explored an effective quality control process for Grade 8 Hex Nuts price, Hex Cap Screws price, Stud Bolts Weight Chart, We never stop improving our technique and high quality to help keep up using the enhancement trend of this industry and meet your gratification effectively. In case you are intrigued in our items, please call us freely.
Factory Cheap Hot ASTM F436 F436M Hardened Steel Washers to Singapore Importers Detail:

ASTM F436 F436M Hardened Steel Washers

Hardened Circular, Clipped Circular, and Extra-Thick Washers, Beveled Washers

Metric Size: M12-M100 

Inch Size: 1/4”-4”

Material Grade: Through hardened washers shall have a hardness of 38 to 45 HRC, except when zinc-coated by the hot-dip process, in which case they shall have a hardness of 26 to 45 HRC.

Metric washers are suitable for use with fasteners covered in Specifications A 325M, A 490M, A 563M and with fasteners of Specification F 568 property classes 8.8 and higher.

Inch washers are suitable for use with fasteners covered in Specifications A325, A 354, A 449, and A 490.

Finish: Black Oxide, Zinc Plated, Hot Dip Galvanized, Dacromet, and so on

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet

Advantage: High Quality and Strict Quality Control, Competitive price,

Timely delivery; Technical support, Supply Test Reports

Please feel free to contact us for more details.


Product detail pictures:

Factory Cheap Hot ASTM F436 F436M Hardened Steel Washers to Singapore Importers detail pictures

Factory Cheap Hot ASTM F436 F436M Hardened Steel Washers to Singapore Importers detail pictures

Factory Cheap Hot ASTM F436 F436M Hardened Steel Washers to Singapore Importers detail pictures

Factory Cheap Hot ASTM F436 F436M Hardened Steel Washers to Singapore Importers detail pictures

Factory Cheap Hot ASTM F436 F436M Hardened Steel Washers to Singapore Importers detail pictures


No matter new customer or old customer, We believe in long term and trusted relationship for Factory Cheap Hot ASTM F436 F436M Hardened Steel Washers to Singapore Importers, The product will supply to all over the world, such as: Bulgaria, Cannes, Birmingham, Our products are produced with the best raw materials. Every moment, we constantly improve the production programme. In order to ensure better quality and service, we have been focusing on the production process. We have got high praise by partner. We are looking forward to establishing business relationship with you.



  • Departmental Procedures & Guidelines for Inspections, Certifications, Load Testing, Repairs & Painting of Fire Escapes
    Inspections by Structural Engineers, Fire Escape Engineers or others acceptable to the Official:
    In layman’s terms, the city official is looking for a registered structural engineer or others qualified and acceptable by the Fire/Code Official to do a Critical Examination in lieu of a Live Load Test (criteria submitted or discussed prior to inspection) and issues written verification and certification that all connections are free of internal rust or rot as well as all original hardware (square head bolts or rivet) are reinforced and or replaced in lieu of Live Load Test. All supports (thru-bolts or cemented) into the wall must be verified and certified in lieu of Live Load Test. A fire escape confidence test and tag must be submitted if fire escape passed. The report with photos identifying violations for repairs must include repair criteria submitted to the official for repair vendor to use as a guide during and with engineer oversight of permitted repairs. A Fire Escape Confidence Test and tags identifying certified condition are then submitted. Recommended cycle for live load testing is 20 yrs after total refurbishment or as required by official.

    Repairs by Ornamental Ironworkers, Welding Companies or others acceptable to the Official:

    In layman’s terms, the city official is looking for a qualified licensed repair vendor to do all work under repair permit (if required) with engineer oversight of repair criteria submitted for approval to the official in lieu of Live Load Test. All connections must be free of internal rust or rot, spot primed and sealed. All worn material repaired and or replaced. All supports into wall reinforced, repaired and certified in a Fire Escape Confidence Test. In lieu of Live Load Test, all square head bolts, rivets and or welded connections must be certified, reinforced and or replaced based on age or condition. All ladders and cantilevers must be balanced and drop 2-3 ft per second, hit the ground and stay down and must lead to a public way. All roof ladders must be secure. No full painting of any fire escape until all spot painted repairs are inspected and certified under engineer oversight and or city official permit sign-off. Full replacement is subject to permits and or possible code upgrade requirements.
    Painting by EPA Licensed Renovators (if lead paint is present) or others acceptable to Official:
    In layman’s terms, the city official is looking for a paint vendor (EPA Certified Renovator if required) to do all work as per EPA Guidelines due to the fact that all fire escapes older than 1978 are presumed to have lead (EPA) unless identified as no lead or low lead by a licensed lead inspector. Entire building will be notified with signage and all precautions shall be taken to collect paint chips at grade. No sandblasting or power assisted scraping without full fire escape encapsulation under EPA Guidelines. All major connection shall be sealed from water intrusion before during or after painting. All escapes should be spot painted every 3-5 yrs and fully painted every 5-10 yrs or as needed or ordered by a Fire/Code Official.
    For more information please visit our website at https://fireescapeengineers.com or call 866-649-0333
    Fire Escape Engineers is an approved member of the Fire Escape Services Network https://www.fireescpeservices.com and a founding member of the National Fire Escape Association (NFEA) https://www.nationalfireescapeassociation.org
    For more information please visit our website at https://fireescapeengineers.com or call 866-649-0333
    Fire Escape Engineers is an approved member of the Fire Escape Services Network https://www.fireescpeservices.com and a founding member of the National Fire Escape Association (NFEA) https://www.nationalfireescapeassociation.org
    For more information please visit our website at https://fireescapeengineers.com or call 866-649-0333
    Fire Escape Engineers is an approved member of the Fire Escape Services Network https://www.fireescpeservices.com and a founding member of the National Fire Escape Association (NFEA) https://www.nationalfireescapeassociation.org



    Test Bolts in SolidWorks simulation. Bolt tightening with 200 N.m

    Related Products