High Quality Plow Bolts with Nuts for Boston Manufacturers

High Quality Plow Bolts with Nuts for Boston Manufacturers

Short Description:

Professional manufacturer of Plow bolts, feature a flat or dome countersunk head design, with a square neck to prevent turning when the nut is tightened or removed. They are used in Excavator, wheel loader, bulldozer, backhoe loader blades & cutting edges.   Fit for Caterpillar, Volvo, Doosan, Komatsu, Komelco, Ajax, JCB, BYG Inch Size: 3/8”-1.3/8” with various lengths Metric Size: M10-M36 with various lengths Grade: SAE J429 Grade 5, 8; 170 KSI, 180 KSI; ISO 898-1 class 8.8, 10.9, 12.9 F...


Product Detail

Product Tags

Sincerity, Innovation, Rigorousness, and Efficiency would be the persistent conception of our corporation to the long-term to establish collectively with customers for mutual reciprocity and mutual benefit for A194 7M Heavy Hex Nuts OEM, Stud Bolts Torque Values, 12-Point Flange Screws to Vietnam, We sincerely welcome close friends to barter company and start cooperation with us. We hope to affix hands with mates in different industries to make a excellent future.
High Quality Plow Bolts with Nuts for Boston Manufacturers Detail:

Professional manufacturer of Plow bolts, feature a flat or dome countersunk head design, with a square neck to prevent turning when the nut is tightened or removed. They are used in Excavator, wheel loader, bulldozer, backhoe loader blades & cutting edges.

 

Fit for Caterpillar, Volvo, Doosan, Komatsu, Komelco, Ajax, JCB, BYG

Inch Size: 3/8”-1.3/8” with various lengths

Metric Size: M10-M36 with various lengths

Grade: SAE J429 Grade 5, 8; 170 KSI, 180 KSI; ISO 898-1 class 8.8, 10.9, 12.9

Finish: Plain, Black Oxide, Zinc Plated, and so on

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet

Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports

Please feel free to contact us for more details.


Product detail pictures:

High Quality Plow Bolts with Nuts for Boston Manufacturers detail pictures

High Quality Plow Bolts with Nuts for Boston Manufacturers detail pictures


To fulfill the customers' over-expected satisfaction , we have now our strong crew to provide our greatest general assistance which incorporates promoting, gross sales, planning, creation, top quality controlling, packing, warehousing and logistics for High Quality Plow Bolts with Nuts for Boston Manufacturers, The product will supply to all over the world, such as: Salt Lake City, Thailand, Boston, Our expert engineering team will generally be prepared to serve you for consultation and feedback. We're able to also give you with free of charge samples to meet your requirements. Best efforts will likely be produced to provide you the best service and merchandise. When you are keen on our business and items, make sure you speak to us by sending us emails or call us quickly. In an effort to know our merchandise and company extra, you may come to our factory to view it. We'll generally welcome guests from all over the world to our business to create business relations with us. Be sure to feel cost-free to speak to us for small business and we believe we are going to share the best trading experience with all our merchants.



  • Departmental Procedures & Guidelines for Inspections, Certifications, Load Testing, Repairs & Painting of Fire Escapes
    Inspections by Structural Engineers, Fire Escape Engineers or others acceptable to the Official:
    In layman’s terms, the city official is looking for a registered structural engineer or others qualified and acceptable by the Fire/Code Official to do a Critical Examination in lieu of a Live Load Test (criteria submitted or discussed prior to inspection) and issues written verification and certification that all connections are free of internal rust or rot as well as all original hardware (square head bolts or rivet) are reinforced and or replaced in lieu of Live Load Test. All supports (thru-bolts or cemented) into the wall must be verified and certified in lieu of Live Load Test. A fire escape confidence test and tag must be submitted if fire escape passed. The report with photos identifying violations for repairs must include repair criteria submitted to the official for repair vendor to use as a guide during and with engineer oversight of permitted repairs. A Fire Escape Confidence Test and tags identifying certified condition are then submitted. Recommended cycle for live load testing is 20 yrs after total refurbishment or as required by official.

    Repairs by Ornamental Ironworkers, Welding Companies or others acceptable to the Official:

    In layman’s terms, the city official is looking for a qualified licensed repair vendor to do all work under repair permit (if required) with engineer oversight of repair criteria submitted for approval to the official in lieu of Live Load Test. All connections must be free of internal rust or rot, spot primed and sealed. All worn material repaired and or replaced. All supports into wall reinforced, repaired and certified in a Fire Escape Confidence Test. In lieu of Live Load Test, all square head bolts, rivets and or welded connections must be certified, reinforced and or replaced based on age or condition. All ladders and cantilevers must be balanced and drop 2-3 ft per second, hit the ground and stay down and must lead to a public way. All roof ladders must be secure. No full painting of any fire escape until all spot painted repairs are inspected and certified under engineer oversight and or city official permit sign-off. Full replacement is subject to permits and or possible code upgrade requirements.
    Painting by EPA Licensed Renovators (if lead paint is present) or others acceptable to Official:
    In layman’s terms, the city official is looking for a paint vendor (EPA Certified Renovator if required) to do all work as per EPA Guidelines due to the fact that all fire escapes older than 1978 are presumed to have lead (EPA) unless identified as no lead or low lead by a licensed lead inspector. Entire building will be notified with signage and all precautions shall be taken to collect paint chips at grade. No sandblasting or power assisted scraping without full fire escape encapsulation under EPA Guidelines. All major connection shall be sealed from water intrusion before during or after painting. All escapes should be spot painted every 3-5 yrs and fully painted every 5-10 yrs or as needed or ordered by a Fire/Code Official.
    Fire Escape Codes:
    NFPA Lifesafety Code 101 7.2.8.6.2 The authority having jurisdiction shall be permitted to approve any existing fire escape Stair that has been shown by load test or other satisfactory evidence to have adequate strength.

    For more information please visit our website at https://fireescapeengineers.com or call 866-649-0333
    Fire Escape Engineers is an approved member of the Fire Escape Services Network https://www.fireescpeservices.com and a founding member of the National Fire Escape Association (NFEA) https://www.nationalfireescapeassociation.org



    AutoCAD 3D Pipe / 3D Piping Tutorial. This tutorial shows step by step how to create a 3D Pipe / 3D Piping in AutoCAD.

    Related Products