High reputation for DIN933 Din609 ISO4017 JIS1180 Metric Hex Head Bolts for Macedonia Factories

High reputation for DIN933 Din609 ISO4017 JIS1180 Metric Hex Head Bolts for Macedonia Factories

Short Description:

Metric Size Hex Head Bolts Hex Cap Screws Hex Fit Bolts Standard: DIN931, DIN933, DIN960, DIN961, DIN558, DIN601, DIN609, DIN610 ISO4014, ISO4017, ISO8765, ISO8676,BS4190, BS3692, UNI5739, UNI5740, JIS1180 Thread Size: M5-M80 with various lengths Class: ISO 898-1 class 4.6, 4.8, 5.6, 5.8, 6.8, 8.8, 10.9, 12.9 Finish: Black Oxide, Zinc Plated, Hot Dip Galvanized, Dacromet, and so on Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Contro...


Product Detail

Product Tags

We now have our own gross sales team, style and design workforce, technical crew, QC workforce and package group. We now have strict quality manage procedures for each system. Also, all of our workers are experienced in printing industry for A193 B7 Combination Studs to Irish, Tension Control Bolts price, System HR Structural Nuts price, We are going to empower people by communicating and listening, Setting an example to others and learning from experience.
High reputation for DIN933 Din609 ISO4017 JIS1180 Metric Hex Head Bolts for Macedonia Factories Detail:

Metric Size Hex Head Bolts Hex Cap Screws Hex Fit Bolts

Standard: DIN931, DIN933, DIN960, DIN961, DIN558, DIN601, DIN609, DIN610

ISO4014, ISO4017, ISO8765, ISO8676,BS4190, BS3692, UNI5739, UNI5740, JIS1180

Thread Size: M5-M80 with various lengths

Class: ISO 898-1 class 4.6, 4.8, 5.6, 5.8, 6.8, 8.8, 10.9, 12.9

Finish: Black Oxide, Zinc Plated, Hot Dip Galvanized, Dacromet, and so on

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet

Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports

Please feel free to contact us for more details.


Product detail pictures:

High reputation for DIN933 Din609 ISO4017 JIS1180 Metric Hex Head Bolts for Macedonia Factories detail pictures

High reputation for DIN933 Din609 ISO4017 JIS1180 Metric Hex Head Bolts for Macedonia Factories detail pictures


Our products are broadly regarded and reliable by end users and can meet up with constantly transforming financial and social requires of High reputation for DIN933 Din609 ISO4017 JIS1180 Metric Hex Head Bolts for Macedonia Factories, The product will supply to all over the world, such as: Sao Paulo, Canada, Colombia, To make every client satisfied with us and achieve win-win success, we will continue to try our best to serve and satisfy you! Sincerely looking forward to cooperating with more overseas customers based on mutual benefits and great future business. Thank you.



  • Link to the full sermon video:

    https://www.youtube.com/watch?v=6FOKbtXq-y0

    “Oh that my child be godly. Oh that my child give it all for the sake of Christ. Oh that my child live for Him. Oh that my child not be enslaved to the very things that so enslave me.

    Do you realize, now listen to this, there’s a balance in everything, there is… but do you realize that if you would just take an agenda/write down a list of how much time you invest in your children in extra curricular activities (versus) how much time you invest in your children with regard to godliness.

    We buy things, we fill them full of media, we put them in the world, and we carry them every place on the face of the earth all throughout the week that our lives are so busy and scattered that we can’t even sit a meal and what are we doing?! We’re making our children enslaved to the very master that enslaves us and ruins our lives instead of teaching our children only one thing is needed: devotion to Christ.”

    - Paul Washer

    “No one can serve two masters, for either he will hate the one and love the other, or he will be devoted to the one and despise the other. You cannot serve God and money. “Therefore I tell you, do not be anxious about your life, what you will eat or what you will drink, nor about your body, what you will put on. Is not life more than food, and the body more than clothing? Look at the birds of the air: they neither sow nor reap nor gather into barns, and yet your heavenly Father feeds them. Are you not of more value than they? And which of you by being anxious can add a single hour to his span of life? And why are you anxious about clothing? Consider the lilies of the field, how they grow: they neither toil nor spin, yet I tell you, even Solomon in all his glory was not arrayed like one of these. But if God so clothes the grass of the field, which today is alive and tomorrow is thrown into the oven, will he not much more clothe you, O you of little faith? Therefore do not be anxious, saying, ‘What shall we eat?’ or ‘What shall we drink?’ or ‘What shall we wear?’ For the Gentiles seek after all these things, and your heavenly Father knows that you need them all. But seek first the kingdom of God and his righteousness, and all these things will be added to you. “Therefore do not be anxious about tomorrow, for tomorrow will be anxious for itself. Sufficient for the day is its own trouble.”

    - Jesus Christ
    (Mat 6:24-34)



    Departmental Procedures & Guidelines for Inspections, Certifications, Load Testing, Repairs & Painting of Fire Escapes
    Inspections by Structural Engineers, Fire Escape Engineers or others acceptable to the Official:
    In layman’s terms, the city official is looking for a registered structural engineer or others qualified and acceptable by the Fire/Code Official to do a Critical Examination in lieu of a Live Load Test (criteria submitted or discussed prior to inspection) and issues written verification and certification that all connections are free of internal rust or rot as well as all original hardware (square head bolts or rivet) are reinforced and or replaced in lieu of Live Load Test. All supports (thru-bolts or cemented) into the wall must be verified and certified in lieu of Live Load Test. A fire escape confidence test and tag must be submitted if fire escape passed. The report with photos identifying violations for repairs must include repair criteria submitted to the official for repair vendor to use as a guide during and with engineer oversight of permitted repairs. A Fire Escape Confidence Test and tags identifying certified condition are then submitted. Recommended cycle for live load testing is 20 yrs after total refurbishment or as required by official.

    Repairs by Ornamental Ironworkers, Welding Companies or others acceptable to the Official:

    In layman’s terms, the city official is looking for a qualified licensed repair vendor to do all work under repair permit (if required) with engineer oversight of repair criteria submitted for approval to the official in lieu of Live Load Test. All connections must be free of internal rust or rot, spot primed and sealed. All worn material repaired and or replaced. All supports into wall reinforced, repaired and certified in a Fire Escape Confidence Test. In lieu of Live Load Test, all square head bolts, rivets and or welded connections must be certified, reinforced and or replaced based on age or condition. All ladders and cantilevers must be balanced and drop 2-3 ft per second, hit the ground and stay down and must lead to a public way. All roof ladders must be secure. No full painting of any fire escape until all spot painted repairs are inspected and certified under engineer oversight and or city official permit sign-off. Full replacement is subject to permits and or possible code upgrade requirements.
    Painting by EPA Licensed Renovators (if lead paint is present) or others acceptable to Official:
    In layman’s terms, the city official is looking for a paint vendor (EPA Certified Renovator if required) to do all work as per EPA Guidelines due to the fact that all fire escapes older than 1978 are presumed to have lead (EPA) unless identified as no lead or low lead by a licensed lead inspector. Entire building will be notified with signage and all precautions shall be taken to collect paint chips at grade. No sandblasting or power assisted scraping without full fire escape encapsulation under EPA Guidelines. All major connection shall be sealed from water intrusion before during or after painting. All escapes should be spot painted every 3-5 yrs and fully painted every 5-10 yrs or as needed or ordered by a Fire/Code Official.
    Fire Escape Codes:

    MASS BUILDING CODE 1001.3 TESTING AND CERTIFICATION ALL EXTERIOR BRIDGES, STEEL OR WOODEN STAIRWAYS, FIRE ESCAPES AND EGRESS BALCONIES SHALL BE EXAMINED AND OR TESTED, AND CERTIFIED FOR STRUCTURAL ADEQUACY AND SAFETY EVERY FIVE YEARS, BY A MASS REGISTERED PROFESSIONAL ENGINEER, OR OTHER QUALIFIED AND ACCEPTABLE TO THE BUILDING OFFICIAL, WHO SHALL THEN SUBMIT AN AFFIDAVIT TO THE BUILDING OFFICIAL.

    NFPA Lifesafety Code 101 7.2.8.6.2 The authority having jurisdiction shall be permitted to approve any existing fire escape Stair that has been shown by load test or other satisfactory evidence to have adequate strength.
    For more information please visit our website at https://fireescapeengineers.com or call 866-649-0333
    Fire Escape Engineers is an approved member of the Fire Escape Services Network https://www.fireescpeservices.com and a founding member of the National Fire Escape Association (NFEA) https://www.nationalfireescapeassociation.org

    Related Products