Online Exporter Round Button Head Guardrail bolts to Israel Manufacturers

Online Exporter Round Button Head Guardrail bolts to Israel Manufacturers

Short Description:

Round Button Head Guardrail bolts Dimension: According to customer’s drawing Metric Szie: M6-M36 with various lengths Inch Size: 1/4”-1.1/2” with various lengths Material Grade: ISO 898-1 4.8, 8.8, 10.9; ASTM A307 A; SAE J429 2, 5, 8 Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped Galvanized and so on Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports P...


Product Detail

Product Tags

Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs of API Flange Stud Bolts , Bolts , API Wellhead Stud Bolts , Sincerely hope we are growing up together with our customers all over the world.
Online Exporter Round Button Head Guardrail bolts to Israel Manufacturers Detail:

Round Button Head Guardrail bolts

Dimension: According to customer’s drawing

Metric Szie: M6-M36 with various lengths

Inch Size: 1/4”-1.1/2” with various lengths

Material Grade: ISO 898-1 4.8, 8.8, 10.9; ASTM A307 A; SAE J429 2, 5, 8

Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped Galvanized and so on

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet

Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports

Please feel free to contact us for more details.


Product detail pictures:

Online Exporter Round Button Head Guardrail bolts to Israel Manufacturers detail pictures

Online Exporter Round Button Head Guardrail bolts to Israel Manufacturers detail pictures


The organization keeps on the procedure concept "scientific management, high quality and efficiency primacy, purchaser supreme for Online Exporter Round Button Head Guardrail bolts to Israel Manufacturers, The product will supply to all over the world, such as: Slovakia, Mauritius, Tunisia, We have established long-term, stable and good business relationships with many manufacturers and wholesalers around the world. Currently, we are looking forward to even greater cooperation with overseas customers based on mutual benefits. Please feel free to contact us for more details.



  • Departmental Procedures & Guidelines for Inspections, Certifications, Load Testing, Repairs & Painting of Fire Escapes
    Inspections by Structural Engineers, Fire Escape Engineers or others acceptable to the Official:
    In layman’s terms, the city official is looking for a registered structural engineer or others qualified and acceptable by the Fire/Code Official to do a Critical Examination in lieu of a Live Load Test (criteria submitted or discussed prior to inspection) and issues written verification and certification that all connections are free of internal rust or rot as well as all original hardware (square head bolts or rivet) are reinforced and or replaced in lieu of Live Load Test. All supports (thru-bolts or cemented) into the wall must be verified and certified in lieu of Live Load Test. A fire escape confidence test and tag must be submitted if fire escape passed. The report with photos identifying violations for repairs must include repair criteria submitted to the official for repair vendor to use as a guide during and with engineer oversight of permitted repairs. A Fire Escape Confidence Test and tags identifying certified condition are then submitted. Recommended cycle for live load testing is 20 yrs after total refurbishment or as required by official.

    Repairs by Ornamental Ironworkers, Welding Companies or others acceptable to the Official:

    In layman’s terms, the city official is looking for a qualified licensed repair vendor to do all work under repair permit (if required) with engineer oversight of repair criteria submitted for approval to the official in lieu of Live Load Test. All connections must be free of internal rust or rot, spot primed and sealed. All worn material repaired and or replaced. All supports into wall reinforced, repaired and certified in a Fire Escape Confidence Test. In lieu of Live Load Test, all square head bolts, rivets and or welded connections must be certified, reinforced and or replaced based on age or condition. All ladders and cantilevers must be balanced and drop 2-3 ft per second, hit the ground and stay down and must lead to a public way. All roof ladders must be secure. No full painting of any fire escape until all spot painted repairs are inspected and certified under engineer oversight and or city official permit sign-off. Full replacement is subject to permits and or possible code upgrade requirements.
    Painting by EPA Licensed Renovators (if lead paint is present) or others acceptable to Official:
    In layman’s terms, the city official is looking for a paint vendor (EPA Certified Renovator if required) to do all work as per EPA Guidelines due to the fact that all fire escapes older than 1978 are presumed to have lead (EPA) unless identified as no lead or low lead by a licensed lead inspector. Entire building will be notified with signage and all precautions shall be taken to collect paint chips at grade. No sandblasting or power assisted scraping without full fire escape encapsulation under EPA Guidelines. All major connection shall be sealed from water intrusion before during or after painting. All escapes should be spot painted every 3-5 yrs and fully painted every 5-10 yrs or as needed or ordered by a Fire/Code Official.

    Related Products