Wholesale Discount DIN580 ASME B18.15 Lifting Forged Eye Bolts to Poland Factories
Short Description:
Lifting Forged Eye Bolts Eye Bolt Steel Hooks Bolts Standard: DIN580, ANSI/ASME B18.15 Metric Size: M6-M80 with various lengths Inch Size: 1/4-3” with various lengths Material Grade: ISO 898-1 class 4.8, 5.8, 6.8, 8.8, 10.9, 12.9, ISO 3056-1 A2-70, A4-70 SAE J429 2, 5, 8; ASTM A193/A320 B7, B8, L7; ASTM A489 Finish: Black Oxide, Zinc Plated, Hot Dip Galvanized, Dacromet, and so on Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control...
Product Detail
Product Tags
Wholesale Discount DIN580 ASME B18.15 Lifting Forged Eye Bolts to Poland Factories Detail:
Lifting Forged Eye Bolts Eye Bolt Steel Hooks Bolts
Standard: DIN580, ANSI/ASME B18.15
Metric Size: M6-M80 with various lengths
Inch Size: 1/4-3” with various lengths
Material Grade: ISO 898-1 class 4.8, 5.8, 6.8, 8.8, 10.9, 12.9, ISO 3056-1 A2-70, A4-70
SAE J429 2, 5, 8; ASTM A193/A320 B7, B8, L7; ASTM A489
Finish: Black Oxide, Zinc Plated, Hot Dip Galvanized, Dacromet, and so on
Packing: Bulk about 25 kgs each carton, 36 cartons each pallet
Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports
Please feel free to contact us for more details.
Product detail pictures:
Our eternal pursuits are the attitude of regard the market, regard the custom, regard the science as well as the theory of quality the basic, believe in the 1st and management the advanced for Wholesale Discount DIN580 ASME B18.15 Lifting Forged Eye Bolts to Poland Factories, The product will supply to all over the world, such as: Argentina, belarus, Wellington, Our company is working by the operation principle of integrity-based, cooperation created, people oriented, win-win cooperation. We hope we can have a friendly relationship with businessman from all over the world.
The FCC Wireless Telecommunications Bureau hosted this annual workshop on the environmental compliance and historic preservation review process required for the construction of wireless communications facilities. The training included information relevant to the construction of all new communications towers and the collocation of communications equipment on existing towers and other structures. Held on October 11, 2018 at FCC Headquarters in Washington, DC. For more information, see https://www.fcc.gov/news-events/events/2018/10/annual-tower-training-workshop