Free sample for Hook Bolts for Armenia Factory

Free sample for Hook Bolts for Armenia Factory

Short Description:

A range of hook bolts, used in the roofing industry for fixing cladding and roofing panels to steel frames. Hook bolts, also commonly known as ‘J’ bolts and supplied with nuts.  Inch Thread Size: 1/4″-4″ with various lengths Metric Thread Size: M6-100 with various lengths Material Grade: Carbon Steel, Alloy Steel, and Stainless Steel covers ASTM F1554, A307, A449, A354, A193, A320, F593, ISO 898-1 4.8, 6.8, 8.8, 10.9 Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped ...


Product Detail

Product Tags

While using the Client-Oriented organization philosophy, a rigorous top quality command process, highly developed production devices and a potent R&D workforce, we normally provide high quality products, outstanding solutions and aggressive charges for ISO 13918 Shear Connectors price, Nylon Flat Washers Metric, Bolts On Tires, Many years of work experience, we have realized the importance of providing good quality products and the best before-sales and after-sales services.
Free sample for Hook Bolts for Armenia Factory Detail:

A range of hook bolts, used in the roofing industry for fixing cladding and roofing panels to steel frames. Hook bolts, also commonly known as ‘J’ bolts and supplied with nuts. 

Inch Thread Size: 1/4″-4″ with various lengths

Metric Thread Size: M6-100 with various lengths

Material Grade: Carbon Steel, Alloy Steel, and Stainless Steel covers ASTM F1554, A307, A449, A354, A193, A320, F593, ISO 898-1 4.8, 6.8, 8.8, 10.9

Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped Galvanized, and so on.

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet. Or, comply with your requirement.

Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports

Please feel free to contact us for more details.

 


Product detail pictures:

Free sample for Hook Bolts for Armenia Factory detail pictures


We've one of the most innovative manufacturing devices, experienced and qualified engineers and workers, recognized good quality handle systems and also a friendly experienced income team pre/after-sales support for Free sample for Hook Bolts for Armenia Factory, The product will supply to all over the world, such as: Estonia, Madrid, Bangkok, Our company is working by the operation principle of integrity-based, cooperation created, people oriented, win-win cooperation. We hope we can have a friendly relationship with businessman from all over the world.



  • website:https://www.jhmindustry.com/
    Shanghai Jian & Mei Industry and Trade Co., Ltd. is the company which manufacture and export fasteners and metal hardware, founded in 2006, with import-export authority. Now, 80% products export to all over the world and 20% sell in domestic market.



    Monster Transmission Presents Curt’s Corner as Curt goes over how to exchange the lever arms for the Detent or TV Cable Rod
    This process and principle will apply for the Ford AOD Transmission, Ford AODE Transmission, or the Ford 4R70W transmission.

    In order to change the linkage you’ll have to change it from the inside of the pan. There are 16 different linkage arms offered for an AOD Ford Transmission. So there are a lot of variables, such as 2 wheel drive, or if it’s a truck, or a Mustang, etc…
    If your transmission is built by Monster Transmission we will provide the specific linkage system that you request.

    To start the process you’ll remove the pan, and for a little more room to work with the transmission filter as well. Then the transmission valve body is exposed and you’ll be able to access your internal shift linkage system. In the linkage Monster Transmission during a rebuild will add an extra component to prevent the shaft from going behind the TV rod. Once inside you’ll first remove the rooster tail which has an 8mm bolt. Then under the rod there is a 13/16″ nut that you will loosen that will release the tension off of the shaft.
    Then a roll pin that fits inside of the casting of the case. This prevents the rod from sliding out of the case. You can use cutting dice or needle nose pliers to remove it.
    Once that pin is removed the linkage will pull out after removing that 13/16 nut that was previously loosened. Then you can slide the linkage out of the case. The new linkage will then slide over the TV shaft, and line the rooster tail up with the linkage. The 2 flat lands are equal on both sides so it could be placed up or down. Then tighten the 13/16 nut on the new shaft. Before tightening all the way, make sure the linkage is all lined up. If you miss the valve you won’t have any movement at all. So make sure its lined up correctly. Make sure the valve and that the TV system is correctly attached. Then install the roll pin and tap it into place, not too far down though so you can remove at a later time if needed. Then there is a spring back behind the TV valve rod you can pull it around and rest it against a shift place on the valve body. Then reinstall the rooster tail tensioner.
    Then its re-install it and test to make sure all linkage works properly.
    Also verify the TV Bracket is attached correctly and springs back, then reinstall the transmission filter and filter gasket. Then last but not least the pan gasket and transmission pan.

    If you still have further questions then give us a call at 800-708-0087

    Check out our site https://MonsterTransmission.com

    Related Products