Top Quality ASTM F1554 Anchor Bolts Foundation Bolts to Italy Importers

Top Quality ASTM F1554 Anchor Bolts Foundation Bolts to Italy Importers

Short Description:

The ASTM F1554 specification covers anchor bolts designed to anchor structural supports to concrete foundations. F1554 anchor bolts can take the form of either headed bolts, straight rods, or bent anchor bolts. Thread Size: 1/4″-4″ with various lengths Grade: ASTM F1554 Grade 36, 55, 105 Various material grade and metric size are also available Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped Galvanized, and so on. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet....


Product Detail

Product Tags

We always believe that one's character decides products' quality, the details decides products' quality ,with the REALISTIC,EFFICIENT AND INNOVATIVE team spirit for Double End Studs price, Hex Cap Screw Dimensions Table, Din975 Threaded Rods price, Welcome all customers of home and abroad to visit our company, to forge a brilliant future by our cooperation.
Top Quality ASTM F1554 Anchor Bolts Foundation Bolts to Italy Importers Detail:

The ASTM F1554 specification covers anchor bolts designed to anchor structural supports to concrete foundations.

F1554 anchor bolts can take the form of either headed bolts, straight rods, or bent anchor bolts.

Thread Size: 1/4″-4″ with various lengths

Grade: ASTM F1554 Grade 36, 55, 105

Various material grade and metric size are also available

Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped Galvanized, and so on.

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet. Or, comply with your requirement.

Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports

Please feel free to contact us for more details.

 


Product detail pictures:

Top Quality ASTM F1554 Anchor Bolts Foundation Bolts to Italy Importers detail pictures

Top Quality ASTM F1554 Anchor Bolts Foundation Bolts to Italy Importers detail pictures

Top Quality ASTM F1554 Anchor Bolts Foundation Bolts to Italy Importers detail pictures


No matter new customer or outdated client, We believe in extensive phrase and trusted relationship for Top Quality ASTM F1554 Anchor Bolts Foundation Bolts to Italy Importers, The product will supply to all over the world, such as: India, Denver, Algeria, Aiming to grow to be by far the most professional supplier within this sector in Uganda, we keep researching on the creating procedure and raising the high quality of our principal goods. Till now, the merchandise list has been updated on a regular basis and attracted customers from around the globe. Detailed data can be obtained in our web page and you'll be served with good quality consultant service by our after-sale team. They're going to allow you to get complete acknowledge about our items and make a satisfied negotiation. Small business check out to our factory in Uganda can also be welcome at any time. Hope to obtain your inquiries to get a happy co-operation.




  • Monster Transmission Presents Curt’s Corner as Curt goes over how to exchange the lever arms for the Detent or TV Cable Rod
    This process and principle will apply for the Ford AOD Transmission, Ford AODE Transmission, or the Ford 4R70W transmission.

    In order to change the linkage you’ll have to change it from the inside of the pan. There are 16 different linkage arms offered for an AOD Ford Transmission. So there are a lot of variables, such as 2 wheel drive, or if it’s a truck, or a Mustang, etc…
    If your transmission is built by Monster Transmission we will provide the specific linkage system that you request.

    To start the process you’ll remove the pan, and for a little more room to work with the transmission filter as well. Then the transmission valve body is exposed and you’ll be able to access your internal shift linkage system. In the linkage Monster Transmission during a rebuild will add an extra component to prevent the shaft from going behind the TV rod. Once inside you’ll first remove the rooster tail which has an 8mm bolt. Then under the rod there is a 13/16″ nut that you will loosen that will release the tension off of the shaft.
    Then a roll pin that fits inside of the casting of the case. This prevents the rod from sliding out of the case. You can use cutting dice or needle nose pliers to remove it.
    Once that pin is removed the linkage will pull out after removing that 13/16 nut that was previously loosened. Then you can slide the linkage out of the case. The new linkage will then slide over the TV shaft, and line the rooster tail up with the linkage. The 2 flat lands are equal on both sides so it could be placed up or down. Then tighten the 13/16 nut on the new shaft. Before tightening all the way, make sure the linkage is all lined up. If you miss the valve you won’t have any movement at all. So make sure its lined up correctly. Make sure the valve and that the TV system is correctly attached. Then install the roll pin and tap it into place, not too far down though so you can remove at a later time if needed. Then there is a spring back behind the TV valve rod you can pull it around and rest it against a shift place on the valve body. Then reinstall the rooster tail tensioner.
    Then its re-install it and test to make sure all linkage works properly.
    Also verify the TV Bracket is attached correctly and springs back, then reinstall the transmission filter and filter gasket. Then last but not least the pan gasket and transmission pan.

    If you still have further questions then give us a call at 800-708-0087

    Check out our site https://MonsterTransmission.com

    Related Products