Wholesale price for EN 14399-3 and 7 Structural Bolt Set for Proloading to Provence Importers
Short Description:
BS EN 14399-3 and 7 System HR Structural Bolt Set for Preloading DIN EN 14399-3 and 7 System HR Structural Bolt Set for Preloading Thread Size: M12-M36 with various length Grade: Bolt-10.9/8.8, Nut-10/8, Washer-300~370HV Finish: Black Oxide, Zinc Plating, Hot Dip Galvanized, Dacromet, and so on Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports Please feel ...
Product Detail
Product Tags
Wholesale price for EN 14399-3 and 7 Structural Bolt Set for Proloading to Provence Importers Detail:
BS EN 14399-3 and 7 System HR Structural Bolt Set for Preloading
DIN EN 14399-3 and 7 System HR Structural Bolt Set for Preloading
Thread Size: M12-M36 with various length
Grade: Bolt-10.9/8.8, Nut-10/8, Washer-300~370HV
Finish: Black Oxide, Zinc Plating, Hot Dip Galvanized, Dacromet, and so on
Packing: Bulk about 25 kgs each carton, 36 cartons each pallet
Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports
Please feel free to contact us for more details.
Product detail pictures:


With our leading technology as well as our spirit of innovation,mutual cooperation, benefits and development, we will build a prosperous future together with your esteemed company for Wholesale price for EN 14399-3 and 7 Structural Bolt Set for Proloading to Provence Importers, The product will supply to all over the world, such as: India, Ecuador, Brisbane, For many years, we have adhered to the principle of customer oriented, quality based, excellence pursuing, mutual benefit sharing. We hope, with great sincerity and good will, to have the honor to help with your further market.
We can give design and solution for all industries which require electroplating,zinc coating or hot dip galvanizing equipment.
We will design the electroplating,zinc coating or hot dip galvanizing plant and production line according to your requirements.
We supply electroplating,zinc coating or hot dip galvanizing equipment for bolt nut and washer factory,steel pipe factory,road guard rail and other parts manufacturer.
The heating type could be electric heating,gas heating,oil heating,the line designed waste heat using system,will save much cost for our customer.
The zinc pot could be iron,ceramic and bricks made.
The line have environment protect and pollution control equipment,will assure satisfy requirement of national.
1. Application: to produce the fasteners in automatic actions of loading/decreasing/rinsing/pickling/flux coating/drying/hot-dip galvanizing/centrifugal
2. Technology flow: work piece→ decreasing→ rinsing→ pickling→ rinsing→ flux coating→ drying→ hot galvanizing→ centrifugal → water cooling
3. Composition
a) loading barrel 1 pc
b) degreasing tank : 2 pcs
c) rinsing tank: 1 pcs
d) pickling tank: 3 pcs
e) rinsing tank : 3 pcs
f) flux coating: 1 pcs
g) conveyor belt drying furnace 1 set
h) rotating barrel mechanism 1 set
i) hot galvanizing tank with loading/transmission system 1 set
j) centrifugal machine 1 set
4. main technical specifications:
a) size of fasteners : on request
b) zinc coating thickness: 0.04-0.06mm(ASTM/DIN/AS/ISO)
c) productivity: 1.5 ton/hour
5. Hot galvanizing loading/transmission robot
1) The robot is consists of supporting arm, which is welded on the H beam frames;
2)Loading and transmission automatically under orders
3)Barrels can be rotated and tilted for better galvanizing;
6. Hot galvanizing tank
1)Tank material: ceramic tank/steel kettle
2)Tank dimension: 3500*2000*1000mm
3)Heating method: electrical inner heating(according to condition of customers,can be heated by natural gas or oil)
4)Zinc liquid temperature range: 450-560℃
5)Centrifugal machine
7. Scrubber system
1)sucking cover is installed above the tanks or aside of tanks,be connected by one channel;
2) wasted air treatment tower:material 10mmPP;PP filled material,water proofing film,vertical chemical pump,spraying mechanism,centrifugal fan
Some tips on the proper way to install a aluminum fuel tank in boat. Which does not include foam or fiberglass. Only Neoprene rubber, 5200 , screws, and thats it. Dont use anything that holds water like WOOD or FOAM it will cause crevice corrosion.





